+908.879.5122
Mon - Fri 7:30AM-4:30PM
105-B Parker Road Chester, NJ 07930

Strahman Valve

Bethlehem, PA

Concrete Slab Modification for New manufacturing Equipment.

Strahman Valve, a global leader in the design and manufacturer of innovative wash down equipment and custom process valves, needed a very specific modification to their existing slab to accommodate a new, Doosan DBC Horizontal Boring Machine.  R & R was contracted to remove parts of the existing slab, excavate inside building, 5 vertical feet, install soil liner, construct reinforcement grids and pour new slab, 4’thick.  All work had to be completed and protected while the plant was up and running.

Project Name: Concrete Slab Modification for New manufacturing Equipment

Project Owner: Strahman Valve

Commencement Date: June 2018

Project Status: Complete

Project Service

Concrete Slab Modification

About Us

While passionate about excavation and site contracting, R&R Construction has become the go-to company for site-work solutions including heavy equipment maintenance, repair, and parts. Whether reaching out to R&R for Contracting, Excavation, or Maintenance and Repairs, we ensure that each and every project maintains our same quality service, dedicated staff, and unwavering ethics.

About Us