Strahman Valve, a global leader in the design and manufacturer of innovative wash down equipment and custom process valves, needed a very specific modification to their existing slab to accommodate a new, Doosan DBC Horizontal Boring Machine. R & R was contracted to remove parts of the existing slab, excavate inside building, 5 vertical feet, install soil liner, construct reinforcement grids and pour new slab, 4’thick. All work had to be completed and protected while the plant was up and running.
Project Name: Concrete Slab Modification for New manufacturing Equipment
Project Owner: Strahman Valve
Commencement Date: June 2018
Project Status: Complete
While passionate about excavation and site contracting, R&R Construction has become the go-to company for site-work solutions including heavy equipment maintenance, repair, and parts. Whether reaching out to R&R for Contracting, Excavation, or Maintenance and Repairs, we ensure that each and every project maintains our same quality service, dedicated staff, and unwavering ethics.